Skip to content
Monday through Friday, 8:00 to 17:30 (continuous)
All products
Dodge logo · DODGE FB-DLEZ-100-PCR
Flange bearing 4 holes DODGE FB-DLEZ-100-PCR

Product page

Flange bearing 4 holes DODGE FB-DLEZ-100-PCR

Manufacturer Part Number
FB-DLEZ-100-PCR
Brand
DODGEOfficial brand
Category
Bearing housings
Subcategory
Y-bearing unit
Series
ER-Series

DODGE

We respond promptly.

Request your quote via WhatsApp or email, with the quantity and time frame you need.

Can't find the exact model? Write to us with the part number or model you're looking for: we'll find it and quote it, even if it's not listed in the catalog.

Ask via WhatsAppAsk via email

Description

DODGE FB-DLEZ-100-PCR is a flange bearing 4 holes reference, within Bearing housings. Request a quote for FB-DLEZ-100-PCR via WhatsApp or email with the quantity you need; we respond promptly with lead time and equivalents.

The DODGE ER-Series 4-bolt flange bracket with insert bearing is a mounted unit ready to be fixed onto a flat surface. It is used to guide rotating shafts in equipment where rigid support and simple alignment are required. MR Accesorios Industriales sells this line as an official brand, backed by more than 80 years in the Argentine industrial sector.

The designation of these brackets is read in blocks. The initial letters identify the 4-bolt flange family; the central numeric section refers to the insert size, and the suffixes indicate sealing or configuration variants. In the ER-Series, for example, the codes FB-DLEZ-012-PCR, FB-DLEZ-014-PCR and FB-DLEZ-100-PCR share the same logic: the number defining the shaft diameter changes and the rest of the structure remains. With the complete code, the part you need is identified without ambiguity.

These brackets appear in conveyors, mixers, blowers, centrifugal pumps and packaging lines. In food, textile, chemical and aggregate processing plants in Argentina, they are chosen for the ease of mounting onto sheet metal or steel structure and for the possibility of replacing the insert without disassembling the entire equipment. They are also used in industrial fans and in low- and medium-speed transmission shafts where the flange provides stability.

To select correctly, verify the shaft diameter and the insert fixing type. Check the sealing: in dusty or humid environments, reinforced protection is advisable, and in applications with frequent washing, a closure that retains lubrication. When mounting, rest the flange on a clean, flat surface, tighten the four bolts in a cross pattern and check alignment with the shaft. Lubricate according to the duty cycle and avoid impacts on the insert during installation.

Regarding equivalences, 4-bolt flange brackets with ER-Series inserts cross between manufacturers by shaft diameter and flange configuration, but seals and tolerances may vary. Therefore, it is advisable to compare the complete code and not just the size. If the original equipment comes with another brand, at MR Accesorios Industriales we indicate the alternative compatible with your application.

If you already have the bracket code, send it by WhatsApp along with a photo of the mounting or the worn insert. With that data we quote the part and, if necessary, offer you the equivalent replacement within the DODGE line we sell. We can also advise you on the most suitable sealing according to the working environment of your plant.

This description provides guidance on the product type. Check the configuration and dimensions of this reference.

Dimensions

Número de producto
127612

Frequently Asked Questions

How do I identify the bracket I need?
Take the code engraved on the flange or on the insert and send it complete by WhatsApp. With the shaft number and the sealing suffixes we quote the exact reference or the compatible alternative within the DODGE line.
Can only the insert bearing be replaced?
Yes. These brackets allow replacing the insert without changing the flange, as long as the shaft diameter and the fixing match. Send the insert code and we indicate the corresponding option.
What should I take into account for mounting?
Rest the flange on a flat, clean surface, tighten the four bolts in a cross pattern and check alignment with the shaft. Lubricate according to the duty cycle and avoid impacts on the insert during installation.
Request a quote on WhatsApp